Building a house is similar to managing a
project.
It is vital to know both the time required for each element
in each of the construction phases, as also the activities
that could be carried out parallely at different points of
the schedule.
The attempt here is to guide you from conceptualization right
through to the house warming ceremony. The link below gives
you the indicative time required for a 1000 sq. ft. ground
floor construction.
|