Excavation as per drawing |
13 |
15 |
3 |
|
| |
Pillars/Columns (Up to plinth level) |
18 |
19 |
2 |
|
| |
Soil filling in trenches and
compaction till ground level |
19 |
19 |
1 |
|
| |
Pillars up to lintel level* |
22 |
23 |
2 |
|
| |
Pillars up to roof level* |
26 |
27 |
2 |
|
| |
Soil filling and compaction till
plinth level |
26 |
27 |
2 |
|
| |
Ducts for electrical wiring |
35 |
36 |
2 |
|
| |
Frames for doors & windows |
35 |
35 |
1 |
|
| |
Water Treatment, Heat Treatment |
40 |
40 |
1 |
|
| |
*Including reinforcement, shuttering,
concreting, curing, deshuttering |
|