Construction Sequence
Building a house is similar to managing a project. And what you most need is a virtual planner to make a proper schedule of all the things to do, to make your dream come true.
Check out the 52 Weeks Construction Sequence given below. Follow the ideal time-frames allotted for each of the construction phases and activities. You can make your own customized plan right from conceptualization to the house warming ceremony.
So get started!
Building a house is similar to managing a project.
It is vital to know both the time required for each element in each of the construction phases, as also the activities that could be carried out parallely at different points of the schedule.
The attempt here is to guide you from conceptualization right through to the house warming ceremony. The link below gives you the indicative time required for a 1000 sq. ft. ground floor construction.
52 Weeks Schedule
|
||||||||||||||
|
||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||
| *Including reinforcement, shuttering, concreting, curing, deshuttering | ||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||
|
||||||||||